fbpx

THE FIRST STAGE IS KBK ALLIANCE, LLC, 2010-2013 THE SECOND STAGE IS EXCLUSIVELY BUILDING TECHNOLOGIES, BK LLC, 2014-2015

There were projecting, installation and commissioning of low-current systems of residential complex in village Shchaslyve, Lesia Ukrainka st.,14: local area network, CCTV system, integrated security system and access control

There was mounted:

  • 1530 m optical cable;
  • 3640 m of electric cable;
  • 11790 m UTP cable;
  • 8980 m cable ALARM;
  • 3 floor server cabinets;
  • 4 switching cabinets;
  • 464 LOM ports;
  • 99 stationary video surveillance cameras;
  • 4 video surveillance servers;
  • 2 AC servers;
  • 92 security guards;
  • 17 AC controllers.