fbpx

Foreign projects

Samruk-Energy JSC(state holding on management of electric energy assets in the Republic of Kazakhstan)

Ust-Kamenogorsk HPP

  • Project documentation for automated construction condition diagnostic monitoring system was developed;
  • Engineering and consulting services for implementation of automated construction condition diagnostic monitoring system were provided;
  • “Titan” automated construction condition diagnostic monitoring system was implemented (485 control points were automated, 49 multiplexers, 10 local data concentrators and “Titan” software were installed).

Shulbinsk HPP

  • Project documentation for automated construction condition diagnostic monitoring system was developed;
  • Engineering and consulting services for implementation of automated construction condition diagnostic monitoring system were provided;
  • “Titan” automated construction condition diagnostic monitoring system was implemented (198 control points were automated, 8 multiplexers, 7 local data concentrators and Titan software were installed).

Kazhidro LLC(member of the Hydroproject Association and the Union of Energy Engineers of Kazakhstan)

Cascade of HPPs on the river Shelek

  • Project documentation for automated construction condition monitoring system for 19 HPPs was developed. 

Engurhesi ltd

(hydro-generating company in Georgia, which owns and operates the largest Caucasus HPP)

Inguri HPP

  • A set of construction and installation works for the reconstruction of the on-site building of the HPP was completed.

Leave a Reply

Your email address will not be published. Required fields are marked *