“IT SYSTEMS” LTD.

Delivery and installation of equipment for Google Data Center (DC).

There was installed the following equipment:

  • 4 levels cable trays;
  • 71 server and 8 cross cabinets;
  • convertible fiber optic cables and large-capacity patch panels (192 fibers);
  • power cable and grounding system;
  • server cabinet monitoring system

Leave a Reply

Your email address will not be published. Required fields are marked *