Delivery and installation of equipment for Google Data Center (DC).
There was installed the following equipment:
- 4 levels cable trays;
- 71 server and 8 cross cabinets;
- convertible fiber optic cables and large-capacity patch panels (192 fibers);
- power cable and grounding system;
- server cabinet monitoring system