fbpx

1998 -2001

    Information Technologies were determined as the main direction of activity.
    Company Departments:
    • – Data communications Department

– Distribution Department;

– IT Department;

– Software systems Department;

– Banking Systems Division;

– Corporate projects Division.

    The first serial introduction of the passport control system in 22 international border crossing points through the state border of Ukraine was completed.
    The direction of the computer equipment sale was expanded: peripheral equipment, data storage devices and PC components were added.
    The sale of telecommunication equipment and subscriber base expansion begаn, providing services to security companies with remote control.

Ukrhydroenergo PJSC – part 2

Dniester HPP

  • Automated construction condition monitoring system “Titan” was designed and implemented (304 control points were automated, 6 local data concentrators and “Titan” software were installed);
  • Operations on the design of hardware, installation of equipment, manufacture of metal structures and installation of cable lines of the stationary system for monitoring spatial displacement of structures were carried out;
  • A downstream gauge of the Dniester buffer hydrosystem was designed and installed.

Dniester HPSPP

  • Automated construction condition monitoring system ‘Titan” was designed and implemented (732 control points were automated, 8 local data concentrators with the multiplexing function and “Titan” software were installed);
  • Within the framework of implementation of the first stage of automated construction condition monitoring system in the hydraulic unit No. 1 – 261 control points were automated, 13 units of server and telecommunication equipment, 5 local data concentrators, 12 multiplexers and 8 local switches were installed;
  • Within the framework of implementation of the second stage of automated construction condition monitoring system in the hydraulic units Nos. 1-3 – 906 control points were automated, 2 units of server and telecommunication equipment, 5 local data concentrators, 19 multiplexers and 2 local switches were installed;
  • Within the framework of implementation of automated construction condition monitoring system of the underground complex in the hydraulic unit No. 4 – 318 control points were automated, 6 units of server and telecommunication equipment and 4 local switches were installed;
  • Automated construction condition monitoring system was implemented for the lower reservoir (132 control points were automated, 3 units of server and telecommunication equipment, 8 multiplexers and 5 local data concentrators were installed;
  • Automated construction condition monitoring system was implemented for the pit of the hydraulic unit and the supply water line (61 control points were automated);
  • The geotechnical monitoring subsystem equipment was delivered (90 control points, 9 multiplexers and 3 local data concentrators);
  • The seismometric monitoring subsystem equipment was delivered (13 data registration stations);
  • The seismometric monitoring subsystem equipment was delivered (6 data registration stations).

State Border Guard Service of Ukraine

Modernization of the components of ITS BC “Gart-1” by developing and implementing the subsystem “Biometric control” (reading data from electronic chips of biometric passports) at all checkpoints (2015-2017)

Within the framework of the project, the equipment of special purpose was implemented, namely: software and technical complexes of automation of border control “Gart-1/P” for modernization of the hardware and software components of the PTC BCA “Gart-1/P” at the border crossing points on the first and the second control lines, the central subsystem “Gart-1 CPU” to provide access to the IPCC-Interpol databases.